Quality Assurance and Quality Control Process

Painting Inspection

The coating process is carried out in accordance with customer specifications or project standards. For new coating systems that we have not previously applied, a Painting Qualification Test will be conducted prior to mass production on the valves.

QC performs inspections on:

    • Wet Film Thickness (WFT)
    • Dry Film Thickness (DFT)
    • Adhesion / Pull-Off Test (minimum 3 MPa)

If the adhesion test result is below the required standard, corrective actions will be carried out in accordance with the quality procedures.